Haus Freudenberg

Swimming pool renovation in Kleve, Haus Freudenberg

Variopool has signed a contract with Berndorf Bäderbau to renovate the swimming pool at Haus Freudenberg in Kleve, Germany. The existing movable floor that is equipped with a pushing scissor system will be replaced by the floating technology of Variopool.

The top deck of the movable floor will be made of durable polypropylene. After installing a movable floor in the Sternbuschbad in Kleve last year, Kleve again opted for Variopool technology. The bath will be ready at the end of 2019.