Alan Higgs Centre Coventry project finished

And again the engineers of Variopool have successfully completed a major project. This time it was the swimming pool at the Alan Higgs Center sports centre in Coventry in the UK.

Movable swimming pool floor with a horizontal bulkhead

The project consists of a movable floor of 25 x 17 meters, a horizontal bulkhead of 1.5 x 17 meters, and a movable floor with a flap of 23.5 x 8.5 meters. The complete project was finished on 7 February. The swimming pool opens for the public on February 17th 2020. Watch the video for more information about this great swimming pool.