Duo-movable floor for project in Siheung (South-Korea)

The sports complex consists of a swimming pool, sports halls, separate fitness rooms and a number of karaoke cabins. The swimming pool is a recreational area and a basin of 21 x 50 meters where regional competitions will be organized. This swimming pool is provided with a Duo movable floor of 21 x 24 meters with a traversal bulkhead of 21 x 1 meter, so that 8 lanes of 25 meter tracks are available. The other half can then be adjusted to 2 different depths for a maximum usability of the swimming pool.

The whole is assembled and now ready to fill the pool with water. The expectation is that the delivery can be carried out around July 2019.