Therapypool Het Roessingh in Enschede
Sometimes, you come across projects that are a bit more special than the rest. That was certainly the case with this particular project, for which our installation team traveled to Enschede. The swimming pool was situated in the middle of the building on the first floor, and we had to begin by dismantling the old pool floor before commencing the installation of the new movable floor, measuring 12.5 by 6.9 meters. It was quite a substantial task because we had to completely disassemble the old bottom and transport it outside, all from the first floor.
What made this project even more remarkable was that the patients were present and actively engaged in their rehabilitation. Together with our partners, we made every effort to complete the project as smoothly as possible without causing any disruption to the patients.