Vondersweijde swimming pool with movable pool floor

Opgeleverd 2022

In Oldenzaal we recently finished a project where we installed a new movable floor for a swimming pool, commissioned by the municipality of Oldenzaal. This installation of the floor was done at swimming pool Vonderweijde. It concerns a movable floor of 15 x 9 meters with a flap of 3.6 meters.

Successful installation in Oldenzaal

In a so-called ‘wet situation’, the team was able to complete the installation within a week. In addition to the floor, of course, cylinders were also installed and new electronics, displays and accompanying remote control were installed. The pool is ready for use, and we wish everyone lots of fun with it. On to the next installation!